AV毛片久久久久午夜HD-高清国产一级婬片A片精东-亚洲另类 日韩 欧美 清纯-国产精品国产成人国产三级

Location:Home?>?detail
Dayaoshan Tunnel
Source:International Business Division Date:2018年11月27日

With a total length of 14 kilometers, Dayaoshan Tunnel of Hengyang-Guangzhou Railway, started in 1981 and completed in 1989, at which time it was the longest electrified double-track railway tunnel in China. CREC independently built the entire tunnel and applied the New Austrian Tunneling Method for the first time to build long mountain railway tunnel and won the National Science and Technology Advancement Award.

Daoyaoshan Tunnel

?

Print Close